Concrete Driveways, Hastings, MN
Failed slab torn out and hauled. Base regraded and compacted to 6 inches of Class 5. Slab poured 4 inches for passenger vehicles, 5 to 6 inches where trucks, trailers, or RVs park. Air-entrained mix. Control joints cut on schedule.
Concrete Driveways →




